|
- Inspect System wiring:
- Control heads wiring
- Actuators wiring
- 6503 Electronic interface
- Inspect and monitor your primary and secondary power sources
- Inspect your push/pull cable connections between actuators and controlled devices.
- Perform a system functional test with the engines off and test system operation
from all stations and for all functions available.
(see Kobelt operating instructions)
Click here for the installation PDF
|